National defence hesco sand wall Bastion Concertainer
If need, please feel free email to salesf(at)theqiaoshi.com
Regards,Richeal
Skype:richeal
The key to working out the quantity of manpower required:Ascertain time available for the construction;Calculate the construction time with 4 men and loading equipment.This is your basic construction figure, if you cannot achieve completion within the given time frame then an increase in manpower and equipment is required.
For basic linear construction of 2 JOESCO bastion QS1 unit of 10.6m length, 10 cells, allow 20 minutes using one loading shovel and 4 men. This includes unpacking from a pallet, bouncing the cells out and filling. This is as good a figure as any to use as a guide figure for basic JOESCO concertainer construction.